Bandra-Worli Sea link Chalanachithram.com | Topics | Search
Hide Clipart | Log Out | Register | Edit Profile

Last 30 mins | 1 | 2 | 4 hours     Last 1 | 7 Days

Chalanachithram.com DB » TF Industry related » Archive through July 02, 2009 » Bandra-Worli Sea link « Previous Next »

Author Message
Top of pagePrevious messageNext messageBottom of page Link to this message

Hyd_boy
Side Hero
Username: Hyd_boy

Post Number: 3313
Registered: 05-2007
Posted From: 205.158.160.209

Rating: N/A
Votes: 0 (Vote!)

Posted on Monday, June 29, 2009 - 04:19 pm:   Insert Quote Edit PostDelete PostPrint Post   Move Post (Moderator/Admin Only)Ban Poster IP (Moderator/Admin only)


Jalsa:

toll is Rs 50 one way. The place where the bridge was ending was not selected correctly ata.




Emi undi andaru BEST Buses e vadtharu. Sontha vehchile takkuva mandi use chestharu elago bombay lo.
PVNarasimha Rao Past lo India President. :D
Top of pagePrevious messageNext messageBottom of page Link to this message

Ustad
Comedian
Username: Ustad

Post Number: 1468
Registered: 07-2008
Posted From: 67.163.198.130

Rating: N/A
Votes: 0 (Vote!)

Posted on Monday, June 29, 2009 - 04:17 pm:   Insert Quote Edit PostDelete PostPrint Post   Move Post (Moderator/Admin Only)Ban Poster IP (Moderator/Admin only)


Jalsa:

toll is Rs 50 one way. The place where the bridge was ending was not selected correctly ata.

Initial budget was 300 cr, but actual is 1800 ata.



Desam lo anthe bedar...positives choosi happy avvali
Top of pagePrevious messageNext messageBottom of page Link to this message

Jalsa
Side Hero
Username: Jalsa

Post Number: 4997
Registered: 02-2008
Posted From: 159.53.78.143

Rating: N/A
Votes: 0 (Vote!)

Posted on Monday, June 29, 2009 - 04:06 pm:   Insert Quote Edit PostDelete PostPrint Post   Move Post (Moderator/Admin Only)Ban Poster IP (Moderator/Admin only)

travel time reduced to 7 minutes ata.

toll is Rs 50 one way. The place where the bridge was ending was not selected correctly ata.

Initial budget was 300 cr, but actual is 1800 ata.
Top of pagePrevious messageNext messageBottom of page Link to this message

Hyd_boy
Side Hero
Username: Hyd_boy

Post Number: 3312
Registered: 05-2007
Posted From: 205.158.160.209

Rating: 
Votes: 1 (Vote!)

Posted on Monday, June 29, 2009 - 03:58 pm:   Insert Quote Edit PostDelete PostPrint Post   Move Post (Moderator/Admin Only)Ban Poster IP (Moderator/Admin only)

1999 lo Worli nunchi Bandra povali ante, Worli lo train ekki DADAR lo digi. Dadar nunchi malli western railway trains lo Povalsi vochedi. Train lo velthe ne okka 1:30 hr pattedi.

Ippudu e bridge tho 20 mts lo vellochu anukunta. Traffic chala tagguthundi, Bus travel ekkuva aipothundi Bandra to Worli.
PVNarasimha Rao Past lo India President. :D
Top of pagePrevious messageNext messageBottom of page Link to this message

Apple
Comedian
Username: Apple

Post Number: 1794
Registered: 09-2008
Posted From: 86.169.214.22

Rating: N/A
Votes: 0 (Vote!)

Posted on Monday, June 29, 2009 - 03:52 pm:   Insert Quote Edit PostDelete PostPrint Post   Move Post (Moderator/Admin Only)Ban Poster IP (Moderator/Admin only)

WOW
Top of pagePrevious messageNext messageBottom of page Link to this message

Ustad
Comedian
Username: Ustad

Post Number: 1465
Registered: 07-2008
Posted From: 67.163.198.130

Rating: N/A
Votes: 0 (Vote!)

Posted on Monday, June 29, 2009 - 03:15 pm:   Insert Quote Edit PostDelete PostPrint Post   Move Post (Moderator/Admin Only)Ban Poster IP (Moderator/Admin only)

Looks very good
The Bandra Worli Sea Link is an 8-lane, cable-stayed bridge with pre-stressed concrete viaduct approaches, which will link Bandra and the western suburbs of Mumbai with Worli and central Mumbai, and is the first phase of the proposed West Island Freeway system. The Rs. 1600 crore project of Maharashtra State Road Development Corporation (MSRDC) is being executed by Hindustan Construction Company. Designs and Project management is by M/s DAR Consultants. Although expected to have been completed by December 2008, after a long delay of 5 years, construction is still underway. The bridge is now slated to be inaugurated on June 30. The Sea Link will enable speedy travel between Bandra and Worli, cutting travel times from 60–75 minutes to 7 minutes.

http://en.wikipedia.org/wiki/Bandra-Worli_Sea_Link

http://ishare.rediff.com/video/news-and-politics/first-trip- on-the-bandra-worli-sea-link/639590

Add Your Message Here
Post:
Bold text Italics Underline Create a hyperlink Insert a clipart image HASH(0x8f0a648){Movie Clipart}
Show / Hide regular icons selection options

Click on following links to open cliparts by Alphabetical Order

 A   B   C   D   E   F   G   H   I   J   K   L   M  

 N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Show / Hide Filmy icons selection options

Click on following links to open cliparts by Alphabetical Order

 A   B   C   D   E   F   G   H   I   J   K   L   M  

 N   O   P   Q   R   S   T   U   V   W   X   Y   Z  


Username: Posting Information:
This is a public posting area. Enter your username and password if you have an account. Otherwise, enter your full name as your username and leave the password blank. Your e-mail address is optional.
Password:
E-mail:
Options: Enable HTML code in message
Automatically activate URLs in message
Action: