| Author |
Message |
   
Masularex
Comedian Username: Masularex
Post Number: 1172 Registered: 05-2010 Posted From: 202.133.59.140
Rating: N/A Votes: 0 (Vote!) | | Posted on Wednesday, December 21, 2011 - 11:41 am: |
    |
Methhanithodugu:u think any other Countries have so please name it ..
let me re rephrase my sentence: present method of extracting power from radio active materials and converting it into electricity all over the world is over rated... ... |
   
Methhanithodugu
Hero Username: Methhanithodugu
Post Number: 14238 Registered: 12-2008 Posted From: 59.93.80.27
Rating: N/A Votes: 0 (Vote!) | | Posted on Wednesday, December 21, 2011 - 11:28 am: |
    |
Masularex:let me rephrase my sentence: present method of extracting power from radio active materials and converting it into electricity is over rated. this entire process is not feasible for our time. but still we are doing it and we must do it. I am expecting a major scientific break through in this field in near future which might be more viable. I agree that present setup must continue to reach that break through.
u think any other Countries have so please name it .. Russsia France USA why is that indians cannot have a break through .... Dont waste Food Hyd&Guntur Jagadish Hatsoff |
   
Masularex
Comedian Username: Masularex
Post Number: 1170 Registered: 05-2010 Posted From: 202.133.59.140
Rating: N/A Votes: 0 (Vote!) | | Posted on Wednesday, December 21, 2011 - 11:25 am: |
    |
let me rephrase my sentence: present method of extracting power from radio active materials and converting it into electricity is over rated. this entire process is not feasible for our time. but still we are doing it and we must do it. I am expecting a major scientific break through in this field in near future which might be more viable. I agree that present setup must continue to reach that break through. You'll surprised to know how a nuclear power plant works in real terms; at least in our Indian conditions. For us, nuclear energy is more of a scientific exploration with very high end to end costs and with very little general utility. much more like our space programs. |
   
Methhanithodugu
Hero Username: Methhanithodugu
Post Number: 14235 Registered: 12-2008 Posted From: 59.93.80.27
Rating: N/A Votes: 0 (Vote!) | | Posted on Wednesday, December 21, 2011 - 11:16 am: |
    |
Airliner:
China Super fast ga dooskellutundi ... see that town huaxi in jiangsu http://ibnlive.in.com/photogallery/2858-1.html
 Dont waste Food Hyd&Guntur Jagadish Hatsoff |
   
Airliner
Junior Artist Username: Airliner
Post Number: 162 Registered: 11-2011 Posted From: 136.223.19.68
Rating: N/A Votes: 0 (Vote!) | | Posted on Wednesday, December 21, 2011 - 11:14 am: |
    |
mana vindia ye matram future lo super power avvalanna only way is nuclear power. Risks vunnai but there is no other way to produce electricity for billion people, industries, agriculture. |
   
Coolmac
Side Hero Username: Coolmac
Post Number: 6752 Registered: 05-2007 Posted From: 65.170.103.156
Rating: N/A Votes: 0 (Vote!) | | Posted on Wednesday, December 21, 2011 - 11:06 am: |
    |
Methhanithodugu:Coolma Mee Darmana Vunkle ni Manchi PA /Secretery/PR Officer ni ettukoni Kootantha Exflain them ... satyamved Exodus unte Employment 1 Job per 4 People in family ivvvamanandi ...32,00 cr lost by Ap in 3 months in Pwoer Crisis in Industries FAPSI Gave its Concern Offcially inka manam Gujart lo 15% ni kuda reach avvaleb Insutrial Growth lo ...we are least preferred State for Investments dont forget T-Movement also drags it ... 
prajala gurinchi pattinchukune teeraka opika aallaki ekkadundhi meshaaru... repu elaa gelavali ane gaani... ee roju janal elaa vunna kuch fark nai vaallaki... Gujarat varaku enduku...Tamilnad tho compete cheste chaala ekkuve manam... We are a failed state..doubt ye ledhu indhulo.. |
   
Methhanithodugu
Hero Username: Methhanithodugu
Post Number: 14229 Registered: 12-2008 Posted From: 59.93.80.27
Rating: N/A Votes: 0 (Vote!) | | Posted on Wednesday, December 21, 2011 - 10:59 am: |
    |
Coolma Mee Darmana Vunkle ni Manchi PA /Secretery/PR Officer ni ettukoni Kootantha Exflain them ... satyamved Exodus unte Employment 1 Job per 4 People in family ivvvamanandi ...32,00 cr lost by Ap in 3 months in Pwoer Crisis in Industries FAPSI Gave its Concern Offcially inka manam Gujart lo 15% ni kuda reach avvaleb Insutrial Growth lo ...we are least preferred State for Investments dont forget T-Movement also drags it ...
 Dont waste Food Hyd&Guntur Jagadish Hatsoff |
   
Coolmac
Side Hero Username: Coolmac
Post Number: 6750 Registered: 05-2007 Posted From: 65.170.103.156
Rating: N/A Votes: 0 (Vote!) | | Posted on Wednesday, December 21, 2011 - 10:55 am: |
    |
Masularex:nuclear power is over rated!
ratings maakenduku andi... power kavali 1.2B population ki...ekkadi nunchi techi istaaro cheppandi first |
   
Methhanithodugu
Hero Username: Methhanithodugu
Post Number: 14227 Registered: 12-2008 Posted From: 59.93.80.27
Rating: N/A Votes: 0 (Vote!) | | Posted on Wednesday, December 21, 2011 - 10:47 am: |
    |
Masularex:nuclear power is over rated!
India lo Power Crisis .. In ka AP lo Aithe dont need to say even Cbn Time looks heaven meeru India lo ne untar kada bro ( 3-4 hr day in Hyd) Over rated ante adi emaina Pawan Movie na leka pothe iPad4 aaa Overrated ante inka cheap technologies undochu where is the Production Ippatkippudu 820 Ft Yards maintain Sesthe Srisailam Dam nunchi we can produce electricity its Whole purpose of DAM is for Electricity kaani we are using it to maintain upt 854 FT for PothiReddyPadu-Head-Regulator ofcourse RayalSeema ke ( Summer ante ok fro drinking water) this 2 yrs Rayalseema Got > 250% of their Allocations ... Leaving rest Dry ... and any ways Agriculture has not been profitable in Rayalseem last 2 yrs ... So Bottomiline enti We need solutions ....world countries only shout on emmissions *Wind Energy ki AP not Suitable *Solar Power ( High Input Costs ) all Bogus investors (Claiming land for SEZ) *Bio GAS ( very cumbersome and stinky) *Waste Recycle ( RAMKY is doing ) *Paper Waste Technology ( Japanese Found it recently it will take 50 yr in India) *Natural Gas (Relaince has thouroughly FXUCKED AP its not selling any drop)  Dont waste Food Hyd&Guntur Jagadish Hatsoff |
   
Masularex
Comedian Username: Masularex
Post Number: 1167 Registered: 05-2010 Posted From: 202.133.59.140
Rating: N/A Votes: 0 (Vote!) | | Posted on Wednesday, December 21, 2011 - 09:45 am: |
    |
nuclear power is over rated! |
   
Methhanithodugu
Hero Username: Methhanithodugu
Post Number: 14226 Registered: 12-2008 Posted From: 59.93.80.27
Rating: N/A Votes: 0 (Vote!) | | Posted on Wednesday, December 21, 2011 - 09:26 am: |
    |
europe blames Pak No KANUPP linkage to Radioactivity in Europe, PAEC clarifies ISLAMABAD, Nov 13 (APP): Pakistan Atomic Energy Commission (PAEC) on Sunday refuted a news item appeared in a section of national and international media alleging that higher than normal radioactivity noticed in parts of Europe could have originated from the recent KANUPP incident.In a statement issued here, the PAEC official said that there was no leakage of radiation to the environment from KANUPP on October 19. There was only a spill of heavy water within the containment building, which was brought under control following routine procedures. The release of Iodine-131 is not possible unless there is a nuclear fuel failure, while the incident at KANUPP involved leakage of heavy water which contains tritium and not Iodine-131, said the official. Higher radiation levels were detected in Poland and Ukraine even before October 19 when the KANUPP incident had not even taken place. It may be added that even if there was a leakage from KANUPP, it could not have traveled to Europe without leaving any trace in the surroundings. PAEC routinely monitors radiation level in and around KANUPP and at various locations in the city and country. No unusual levels of radioactivity have been recorded at any of these locations. Furthermore, details of the KANUPP incident were provided to the press and also to the IAEA as per procedure,he said. The entire news item is based upon the statement attributed to the spokesman of the Polish atomic energy agency who only said: âUnconfirmed reports suggest there may have been an incident at a nuclear power station in Pakistan but this requires further confirmationâ. And he did not cite any evidence or proof. None of the international organizations including IAEA has suggested anything leading to the conclusion that radiation in Europe could have come from KANUPP. Pakistan Atomic Energy Commission would like to avail this opportunity to assure the public, that at no point in time in its history, have the radiations from KANUPP been beyond permissible limits and, therefore, there is absolutely no possibility that the type of radiation detected in Europe could have come from KANUPP. Dont waste Food Hyd&Guntur Jagadish Hatsoff |
   
Methhanithodugu
Hero Username: Methhanithodugu
Post Number: 14225 Registered: 12-2008 Posted From: 59.93.80.27
Rating: N/A Votes: 0 (Vote!) | | Posted on Wednesday, December 21, 2011 - 09:23 am: |
    |
PS: Just read bold fonts if busy ... My Point to reckon is , If you are unsure see around the world ,First Educate People that even Gas Cylinder is Dangerous but we still use it .. So Communicate , Educate, Practice New Technology I donno local poor Indians are Sheep they just oppose Nuclear Electric Power ... we will Boost our economy by 500% if we start using this .. ALL WE DO IS JUST RUBBISH Vote bank POLITICS sic }
Pakistanâs third 330 MW nuclear power plant becomes operational CHASHMA, May 12 (APP): Pakistanâs third nuclear electric power plant went operational Thursday, pumping another 330 MW into the national grid in a bid to help meet countryâs growing energy demand and cut down the shortfall. Prime Minister Syed Yusuf Raza Gilani inaugurated the Chashma Nuclear Power Plant Unit-1 (CHASNUPP-2), located near Chashma Barrage on the left bank of River Indus, 32 kilometres south of Mianwali city and, 280 kms south-west of Islamabad. Minister for Water and Power Syed Naveed Qamar, Acting Speaker National Assembly Faisal Karim Kundi, Chairman Pakistan Atomic Energy Commission Dr Ansar Parvez accompanied the Prime Minister. Chairman Joint Chiefs of Staff Committee General Khalid Shamim Wyne, Lt Gen ® Khalid Ahmed Kidwai, Director General, Strategic Plans Division and Pakistanâs ambassador to China Masood Khan were also present. Addressing the gathering, the Prime Minister termed the moment as a proud day for Pakistan and its civil nuclear energy programme. He said the completion of Chashma-2 three months ahead of the scheduled time was a reward for the joint efforts of Chinese and Pakistani teams, the benefits of which will go directly to the people of Pakistan. The Prime Minister said the generation of additional 330 MW electricity would provide immediate relief to a section of consumers, adding that two more power plants C-3 and C-4 already under construction at this site would help in paving the way for PAEC to meet the government assigned target of 8800 MW by the Year 2030. âInfact, I will encourage you to look beyond 2030, say to 2050, and provide Pakistan with far greater capacity than 8800 MW. I am sure, you will accept the challenge,â he said. Gilani also emphasized on paying full attention to the safety of the current and the future nuclear power plants of the country and expressed satisfaction on undergoing a review of safety assessment and emergency preparedness of their plants in the wake of nuclear accident in Japan. Chairman PAEC Dr Ansar Parvez said two more plants C3 and C4 had already been planned in accordance with the safeguard agreements with IAEA approved by the its board of governors in March. He said first concrete of the nuclear island has been poured for C3 and the plant will come on line in 2016. He said the ground-breaking for C4 will take place next month and will come on line 10 months later. He said this would lay the foundation towards the target to produce 8800 MW by year 2013. He said PAEC had put in place systems to ensure safe, reliable and economic operation of the plants, under the regulatory requirements of Pakistan Nuclear Regulatory Authority. He said the events at Fukushima nuclear power plant had been closely monitored and where required, additional measures would be taken to further improve safety and emergency planning. Dr Ansar said plans were also afoot to develop the required human resource to increase indigenous capability of equipment manufacturing and to enhance fuel cycle handling capacity. He said the C1 has operated with better than 98 percent availability factor and a capacity factor above 95 percent. He said according to the tariff settled by NEPRA is RS 4.6 per UNIT or 5.5 cents. He said the project had also impacted the socio-economic conditions of the people living in adjoining areas. He said direct job opportunities had been created and 40 percent employees belonged to Mianwali district. Vice Administrator of SASTIND Wang Yiren congratulated Pakistan on ahead of schedule completion of the plant and said the ties between the two countries were solid as a rock. He said both countries need to strengthen cooperation in nuclear safety and hoped that the joint Pakistan-China team would deliver on time completion of C3 and C4, while ensuring all safety parameters and write new chapters of friendship between the two countries. Later, Prime Minister Gilani gave away honorary shields to the Pakistani and Chinese engineers who contributed to the project. The construction on the Pressurized Water Reactor, built with the Chinese assistance, began on Dec 28, 2005 and was connected to the electricity grid on March 14, 2011. Being operational from today (May 12), the plant has a net capacity of 300 MW, and a gross capacity is 325 MW. With the Chasnupp-2 operational the countryâs nuclear energy generation would rise to 725 megawatts. Current nuclear power generation stands at a mere 2.8 percent of electricity generated in the country. The IAEA Board of Governors had unanimously approved the Safeguards Agreement between Pakistan and IAEA in respect of CHASHMA-2 nuclear power in November 2006. Pakistan âs two research reactors (PARR-I & PARR2) and two nuclear power plants (KANUPP & CHASHMA-1) are already under the IAEA safeguards. CHASNUPP-2 is part of Pakistanâs âEnergy Security Planâ, that envisages an increase in nuclear power generation from the current 425 MWe to 8800 MWe by the year 2030 to meet countryâs growing energy demands. Pakistan had termed the agreement with IAEA a success for Pakistan and recognition of its nonproliferation commitments. Pakistan has a small nuclear power program, with 725 MWe capacity, but plans to increase this substantially. The countryâs first Canadian pressurized heavy water reactor (PHWR) at Karachi - KANUPP, with a gross capacity of 137 MWe is generating net 125 MWe and is under international safeguards. The second unit is Chashma-1 (CHASNUPP-1) in Punjab, a 325 MWe (300 MWe net) 2-loop pressurized water reactor (PWR) has been supplied by Chinaâs CNNC under safeguards. The main part of the plant was designed by Shanghai Nuclear Engineering Research and Design Institute (SNERDI) and it started operations in May 2000. It also has a design life of 40 years. Work on the Chashma-3 and Chashma-4 reactors with 300 MWe each is also under way and would nearly double this capacity, adding another 600 megawatts to the grid. Dont waste Food Hyd&Guntur Jagadish Hatsoff |