| Author |
Message |
   
Scallion
Junior Artist Username: Scallion
Post Number: 231 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 04:18 pm: |
     |
Pipeline:
idra vasthondhi, so GN... I will make sue I will post tomorrow how you can use your solar as captive |
   
Pipeline
Hero Username: Pipeline
Post Number: 11962 Registered: 05-2009 Posted From: 161.141.1.1
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 04:11 pm: |
     |
Scallion:
naa vuddesam entante, captive generation anagane first gurthochedi plant ki saripada generate chesi migilithe grid ki sell cheyatam kada. you take power from grid only during the black start or when the captive plant is under maintenance kada..Solar tho operation ante completely different.. |
   
Pipeline
Hero Username: Pipeline
Post Number: 11961 Registered: 05-2009 Posted From: 161.141.1.1
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 04:03 pm: |
     |
Scallion:pichi question, capitive ki any type will not work if your plan is not connected to grid...
grid connection vundadu ani nenekkadanna rao garu. gas/biomass lanti vayithe availability much better kada ani nenu annadi. also cost wise is it really competitive for captive generation? inkoti mee sponge iron plants lanti vaatikayithe BFG waste heat nundi generate avuddi kada.. |
   
Scallion
Junior Artist Username: Scallion
Post Number: 230 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:58 pm: |
     |
Pipeline:captive consumption ki only solar etta work out avuddi? it has to be back up or the plant doesn't run more than 8 hours in a day (even that is big Q)
pichi question, capitive ki any type will not work if your plan is not connected to grid... Grid ki connect chesinanduvala even if you use your generated power in fill, you need to pay grid Min amounts... tapadu |
   
Pipeline
Hero Username: Pipeline
Post Number: 11958 Registered: 05-2009 Posted From: 161.141.1.1
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:54 pm: |
     |
Kaisersooze:captive solar.
captive consumption ki only solar etta work out avuddi? it has to be back up or the plant doesn't run more than 8 hours in a day (even that is big Q) |
   
Pipeline
Hero Username: Pipeline
Post Number: 11957 Registered: 05-2009 Posted From: 161.141.1.1
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:53 pm: |
     |
Kaisersooze:
pamarru (krishna dt) daggarlo okati vundi rice husk based..okappudu maa FIL try chesaru Kandi village (after patancheru) lo 50MW plant pedadaam ani, not husk based but other agri waste. he and his partner land kooda konnaru but it took long time with Delhi (Nedcap/IRED) and in the mean time he passed away.. |
   
Bza
Junior Artist Username: Bza
Post Number: 453 Registered: 04-2013 Posted From: 158.28.225.226
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:47 pm: |
     |
There is problem for new companies, not sure how many of you know about it. To participate in bidding process, you have to show bidding company has net worth of 2cr/MW. Promotor's or individuals personal assets are not considered for net worth. Project may not be worthy if planned for under 5MW with current interest rates in swadesam. |
   
Kaisersooze
Moderator Username: Kaisersooze
Post Number: 11637 Registered: 04-2009
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:43 pm: |
     |
Scallion:sponge plant ki captive consumption ga
ok..let me know if anyone looking for captive solar...we will install... |
   
Scallion
Junior Artist Username: Scallion
Post Number: 228 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:39 pm: |
     |
Kaisersooze:
initial ga memu idi plan chesindhi vere reason ki... sponge plant ki captive consumption ga vadukundham ani... later sponge plant drop ayamu |
   
Kaisersooze
Moderator Username: Kaisersooze
Post Number: 11636 Registered: 04-2009
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:38 pm: |
     |
Scallion:
good...there is huge demand for these raw materials...will contact u if I need something like this... |
   
Scallion
Junior Artist Username: Scallion
Post Number: 227 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:35 pm: |
     |
Kaisersooze:cool bro...bro idhi availabilty ela vundhi?? easy ga dorukuthundha??
AP lo kontha problem antunaaru kaani maaku Karnataka lo ee 2 1/2 years lo emi ibandhi kaledhu... koni basic ibandhulu definite ga untayi like storage space, rainy season lo operational problems etc lativi... still doing ok inko 3 years ila run ayithe chalu, loans paid off aa tharuvaatha pedaga ibandhi undakapovachu |
   
Kaisersooze
Moderator Username: Kaisersooze
Post Number: 11635 Registered: 04-2009
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:31 pm: |
     |
Scallion:rice husk
cool bro...bro idhi availabilty ela vundhi?? easy ga dorukuthundha?? |
   
Kaisersooze
Moderator Username: Kaisersooze
Post Number: 11634 Registered: 04-2009
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:30 pm: |
     |
Saint:
depends on size..1MW ki 5 Acres atu itu ga...neeku govt thos PPA (power purchase agreement) and 20% down vuntae loans isthai...with modi govt..loan process and setup process kuda easy avuthadi ani anukontunnam.. |
   
Scallion
Junior Artist Username: Scallion
Post Number: 226 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:29 pm: |
     |
Kaisersooze:rawmaterial
maadhi poultry litter and rice husk |
   
Scallion
Junior Artist Username: Scallion
Post Number: 225 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:28 pm: |
     |
Gotcha:Ledu govt max rase rate 6.5 . 5 years back 16rs to start ayi ee rate kochindi. Govt itself buying power at 8 rs if in desperate situation like tg govt ante but thats not the rate prevailing
you could be correct... exact ga thelavali ante "Ministry of New and Renewable Energy"gala web site check chesthe thelusthadi |
   
Kaisersooze
Moderator Username: Kaisersooze
Post Number: 11633 Registered: 04-2009
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:27 pm: |
     |
Scallion:
rawmaterial?? |
   
Gotcha
Hero Username: Gotcha
Post Number: 17836 Registered: 02-2008 Posted From: 107.72.164.50
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:26 pm: |
     |
Saint Aasa dosa appadam. Anni neeku ippude chebite inka ayaniki emi labam, pay his fees and he will tell Kaiser kiche dantlo sagam iste nenu chebuta  This Andhra real estate is for sale. |
   
Saint
Legend Username: Saint
Post Number: 41392 Registered: 01-2011 Posted From: 12.22.163.132
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:23 pm: |
     |
Kaisersooze:let me know if anyone is interested to setup..we will help them out from licensing..equipment..till running...send me an email to kaisersoozeccdb@yahoo.com
requirements cheppu!! Land entha vundali? money mana own entha pettali? bank loans entha techukovachu? inka enti requirements? |
   
Gotcha
Hero Username: Gotcha
Post Number: 17835 Registered: 02-2008 Posted From: 107.72.164.50
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:23 pm: |
     |
Scal bro Ledu govt max rase rate 6.5 . 5 years back 16rs to start ayi ee rate kochindi. Govt itself buying power at 8 rs if in desperate situation like tg govt ante but thats not the rate prevailing This Andhra real estate is for sale. |
   
Scallion
Junior Artist Username: Scallion
Post Number: 224 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:21 pm: |
     |
Kaisersooze:ivi akkada vunai bro AP lo??
maa plant in karnataka, but AP lo kuda chala unayi, one I know that of is in Machalipatnam |
   
Kaisersooze
Moderator Username: Kaisersooze
Post Number: 11632 Registered: 04-2009
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:17 pm: |
     |
Scallion:Bio Mass it is Rupees 5.50
ivi akkada vunai bro AP lo?? |
   
Scallion
Junior Artist Username: Scallion
Post Number: 223 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:17 pm: |
     |
Gotcha:anyone is getting that rate now 5 to 6 rs range nowadays
ledu le parmotional ga solar ki kontha ekuve vasthondhi.... but never ever plan a small plant like 1MW, better stay silent |
   
Kaisersooze
Moderator Username: Kaisersooze
Post Number: 11629 Registered: 04-2009
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:16 pm: |
     |
Botsa_fan:annai entha padathadhi 5MW ki???
7C..land vundha substation deggara lo?? last time KKR time lo konni designated areas chepparu..to reduce transmission costs... |
   
Kaisersooze
Moderator Username: Kaisersooze
Post Number: 11627 Registered: 04-2009
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:14 pm: |
     |
Gotcha:
we do consulting...I didn't setup...but rate wise..inko 3rs penchitae u can invest... |
   
Gotcha
Hero Username: Gotcha
Post Number: 17834 Registered: 02-2008 Posted From: 107.72.164.50
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:13 pm: |
     |
10rs vaste super i dont think anyone is getting that rate now 5 to 6 rs range nowadays This Andhra real estate is for sale. |
   
Scallion
Junior Artist Username: Scallion
Post Number: 222 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:13 pm: |
     |
Sensation:Rate enta istaru?
Bio Mass it is Rupees 5.50, solar ki inkoncham ekuve untadhi.... The rate I am saying is in Karnataka, meek thelusu anukontaga plant udhi akada |
   
Pipeline
Hero Username: Pipeline
Post Number: 11953 Registered: 05-2009 Posted From: 161.141.1.1
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:11 pm: |
     |
chaala land kaavali 1,000MW ante. antha waste land vunda karnool dist lo? |
   
Botsa_fan
Side Hero Username: Botsa_fan
Post Number: 5365 Registered: 07-2013 Posted From: 158.48.6.140
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:11 pm: |
     |
Gotcha:How much rate r u getting?
10rs with subsidy. Jai indiramma,Jai Uttarandhra,Jai Botsa.
|
   
Botsa_fan
Side Hero Username: Botsa_fan
Post Number: 5364 Registered: 07-2013 Posted From: 158.48.6.140
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:10 pm: |
     |
Kaisersooze:
annai entha padathadhi 5MW ki??? Jai indiramma,Jai Uttarandhra,Jai Botsa.
|
   
Gotcha
Hero Username: Gotcha
Post Number: 17833 Registered: 02-2008 Posted From: 107.72.164.50
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:10 pm: |
     |
Kaiser How much rate r u getting? This Andhra real estate is for sale. |
   
Kaisersooze
Moderator Username: Kaisersooze
Post Number: 11626 Registered: 04-2009
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:08 pm: |
     |
let me know if anyone is interested to setup..we will help them out from licensing..equipment..till running...send me an email to kaisersoozeccdb@yahoo.com |
   
Sensation
Side Hero Username: Sensation
Post Number: 3632 Registered: 02-2009 Posted From: 24.98.242.192
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 03:05 pm: |
     |
Rate enta istaru? |
   
Vjawarrior
Hero Username: Vjawarrior
Post Number: 10353 Registered: 02-2014 Posted From: 153.2.247.32
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 02:53 pm: |
     |
Bangarappa:
nee app emaindi...bongulo navvu okati....meee snake chaitu cinema choosava..time pass movie |
   
Bangarappa
Junior Artist Username: Bangarappa
Post Number: 730 Registered: 08-2014 Posted From: 107.133.164.31
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 02:52 pm: |
     |
Vjawarrior:I think 10 years down the lane ....our state will golden anukuntaa....google/fb/msft ravali saami
    M.B.F.4.L |
   
Scallion
Junior Artist Username: Scallion
Post Number: 220 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 02:50 pm: |
     |
Wellsfargo:Details unnaya? ekkada apply cheyyocchu
The Solar Energy Corporation of India, new delhi should be the place |
   
Vjawarrior
Hero Username: Vjawarrior
Post Number: 10352 Registered: 02-2014 Posted From: 153.2.247.32
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 02:49 pm: |
     |
Scallion:inko chamaku enti ante migilina 14 lo okati Guntur district lo ravachu ani talk
so 2 GW for AP naaa.... I think 10 years down the lane ....our state will golden anukuntaa....google/fb/msft ravali saami |
   
Scallion
Junior Artist Username: Scallion
Post Number: 219 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 02:48 pm: |
     |
inko chamaku enti ante migilina 14 lo okati Guntur district lo ravachu ani talk |
   
Wellsfargo
Side Hero Username: Wellsfargo
Post Number: 2309 Registered: 06-2012 Posted From: 49.205.116.106
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 02:47 pm: |
     |
Details unnaya? ekkada apply cheyyocchu |
   
Vjawarrior
Hero Username: Vjawarrior
Post Number: 10349 Registered: 02-2014 Posted From: 153.2.247.32
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 02:45 pm: |
     |
Rbabu: 1GW = 1000MW
yes...tht is HUGEeeeeeeeeeeeee for solar |
   
Rbabu
Side Hero Username: Rbabu
Post Number: 2694 Registered: 09-2013 Posted From: 149.168.240.7
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 02:45 pm: |
     |
Vjawarrior:1GW is huge
1GW = 1000MW |
   
Scallion
Junior Artist Username: Scallion
Post Number: 217 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 02:44 pm: |
     |
Vjawarrior:absolutely...1GW is huge...3 years lo set chestaara annai and generate?
2019 target ants brother |
   
Vjawarrior
Hero Username: Vjawarrior
Post Number: 10348 Registered: 02-2014 Posted From: 153.2.247.32
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 02:41 pm: |
     |
Scallion: think cheanike super undhi, jarigithe... AP ni evadu patukoledu
absolutely...1GW is huge...3 years lo set chestaara annai and generate? |
   
Scallion
Junior Artist Username: Scallion
Post Number: 215 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 02:39 pm: |
     |
Scallion:1GW
think cheanike super undhi, jarigithe... AP ni evadu patukoledu |
   
Scallion
Junior Artist Username: Scallion
Post Number: 213 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 02:34 pm: |
     |
Center tho pani cheyinchukovatam ante adi first tranche lo migatha rendu ekado inka decide cheyaka mundhe mana dagara action start ayindhi |
   
Scallion
Junior Artist Username: Scallion
Post Number: 212 Registered: 09-2014 Posted From: 175.101.67.104
Rating: N/A Votes: 0 (Vote!) | | Posted on Friday, October 17, 2014 - 02:32 pm: |
     |
The Indian government has revealed details of an auction of 1GW of solar projects in the state of Andhra Pradesh that will form the first part of a national 15GW roll out of PV between now and 2019. The Ministry of New and Renewable Energy today published guidelines on the new-look Jawarharlal Nehru National Solar Mission (JNNSM) national mission, which has been overhauled to reflect the solar ambitions of the new Modi government. Initially, the second batch of the second phase of the JNNSM had been expected to allocate 1,500MW of new PV capacity, but this has been thrown out in favour of a much bigger 15GW target by 2019. This target will be rolled out in three tranches – of 3,000MW, 5,000MW and 7,000MW. Under the first tranche, due to run from 2014 to 2017, 3,000MW of solar capacity will be “bundled” with 1,500MW of new coal capacity The Andhra Pradesh auction forms the first part of this initial tranche and will select companies to build projects totalling 1GW on land in the state’s Kurnool District. A JV of public sector companies – JNNSM lead body the Solar Energy Corporation of India (SECI), the Non-Conventional Energy Development Corporation of Andhra Pradesh (NEDCAP) and Andhra Pradesh Power Generation Corporation (APGENCO) – will carry out necessary infrastructure works including roads, water, construction power and pooling substations to speed up implementation of the PV projects. The JV will also select companies to build, own and operate the projects through a tariff-based bidding process. Out of the 1GW on offer, 250MW will be reserved for domestic content requirement (DCR) projects, consistent with other phases of the JNNSM. Individual projects will be no more than 50MW each in size. Power from the projects will be purchased by NTPC Vidyut Vyapar Nigam (NVVN), a subsidiary of the state-owned power generation company, NTPC, under a 25-year power purchase agreement. NVVN will bundle power from the 1,000MW of PV with 500MW of unallocated power from NTPC coal power stations and sell it on to distribution companies in the state. Local solar consultancy, Bridge to India, said in a briefing note about the guidelines that they were in places “confusing and self-contradictory”, leaving open the risk of confusion over responsibilities for site development. “In the past, we have seen that for solar parks in Gujarat and Rajasthan, developers have had to face delays due to a delayed delivery of evacuation infrastructure [getting electricity onto the grid from the systems] and allotment of lands. “It would be much better if the allocation process would begin only after all the developmental work is completed and the evacuation infrastructure has been created at the solar park. Alternatively, the guidelines must delink the risks of land and transmission infrastructure availability from the developers,” Bridge to India said. Bridge to India said it expected the allocation process for the 1GW in Andhra Pradesh - confusingly referred to as part I of tranche I of batch II of phase II of the JNNSM - to begin in December. Details of the remaining 2GW in the first tranche of the beefed up JNNSM or the subsequent two, much larger tranches, have yet to be made public. |