Topics | Search Log Out | Register | Edit Profile
Hide Clipart | Banned/Unbanned User Log | Moderator Login History | Thread Delete/Move Log | Last 30 mins | 1 | 2
Cbn vs YSR in power transmission /ele...

Chalanachithram.com DB » TF Industry related » Archive through March 18, 2013 » Cbn vs YSR in power transmission /electricity YSR wins « Previous Next »
Author Message
 

Gusagusa
Comedian
Username: Gusagusa

Post Number: 1682
Registered: 04-2012
Posted From: 182.73.170.2

Rating: N/A
Votes: 0 (Vote!)

Posted on Monday, March 18, 2013 - 11:46 am:       


Ballasticmissile:

ysr 2007-2012 occhina power plants chuiste avi kuda cbn fruits ante inkem aanali....


 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3985
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Monday, March 18, 2013 - 11:45 am:       


Telugudesam:



In January 2012, it was reported that the Andhra Pradesh government has decided to build additional unit with capacity of 800 MW

inko unit kuda....

The Andhra Pradesh government has decided to utilise the vacant space at the three existing thermal power plants to generate an additional 2,400 MW of power at a cost of over Rs 12,000 crore.

At present, the state is struggling with a power shortage of more than 2000 MW daily. Were the three new thermal projects to be expedited and completed in a short time, it would come as a great boon to power consumers. The three new units are expected to be commissioned by next year.

If reports are to believed, the new technology requires less area compared to the older versions of thermal plants and that, it was learnt, has prompted the government to increase the capacity at the Vijayawada, Krishnapatnam and Kothagudem thermal power stations.

Vijayawada plant at present has a generating capacity of 1760 MW. Apart from the vacant space at the plant, Genco has asked the Vijayawada municipal corporation to provide another 50 acres of wasteland adjacent to the present site so that an 800 MW unit can come up.

Currently, Kothagudem thermal station produces 1720 MW of power. Now that the space available at the site has been surveyed, it has been confirmed that another unit of 800 MW capacity can come up there.
i am leading a pious life so far so good
 

Gusagusa
Comedian
Username: Gusagusa

Post Number: 1681
Registered: 04-2012
Posted From: 182.73.170.2

Rating: N/A
Votes: 0 (Vote!)

Posted on Monday, March 18, 2013 - 11:44 am:       


Boston_baba:

BM kurrodu chakkaga sources petti cheptunnadu.. mee daggara alage edaina official data unte padeyandi.


YES
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3982
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Monday, March 18, 2013 - 11:43 am:       


Telugudesam:

Brother, Kothagudem V plant work 1995 lo start ayyindi. CE Surapaneni Seetharamaiah garu vundevaru.



98 lo 250mw installed malli 2011 lone 500 mw moksham vacchindi kothagudem ki....
i am leading a pious life so far so good
 

Telugudesam
Junior Artist
Username: Telugudesam

Post Number: 738
Registered: 08-2008
Posted From: 136.1.1.102

Rating: N/A
Votes: 0 (Vote!)

Posted on Monday, March 18, 2013 - 11:40 am:       


Ballasticmissile:



Ballasticmissile:

kottagvudem stage6:2011

http://en.wikipedia.org/wiki/Kakatiya_Thermal_Power_Station

http://en.wikipedia.org/wiki/Kothagudem_Thermal_Power_Statio n_V_Stage

http://en.wikipedia.org/wiki/Dr_Narla_Tata_Rao_Thermal_Power _Station


veetillo yevi cbn gori time lo expand avvaledu after 2008 ye ayyai deeniki kuda cbn goride credit aa....



Brother, Kothagudem V plant work 1995 lo start ayyindi. CE Surapaneni Seetharamaiah garu vundevaru.
 

Bittertruth
Junior Artist
Username: Bittertruth

Post Number: 154
Registered: 11-2012
Posted From: 98.156.73.49

Rating: 
Votes: 1 (Vote!)

Posted on Monday, March 18, 2013 - 01:00 am:       


Dma:



Thnks
Just ippude Noth Korea meeda Oka documentary choosa.
Aa desam janalu ditto jaffas. Kaani papam vallani braInwash chesina
vidhanam chooste kallallo neellu vachayi
 

Dma
Side Hero
Username: Dma

Post Number: 8433
Registered: 11-2009
Posted From: 64.134.224.140

Rating: 
Votes: 1 (Vote!)

Posted on Sunday, March 17, 2013 - 11:47 pm:       


Bittertruth:

????Nee yanks. ardham pardham ledaa




Adi yellow media srushti mem voppukom antaaru decoit fans. adee daani ardham.
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3976
Registered: 07-2012
Posted From: 125.99.197.136

Rating: 
Votes: 1 (Vote!)

Posted on Sunday, March 17, 2013 - 10:54 pm:       

inda TTs kosam

quote:

GVK jegurupadu first gas power plant in the country to start its operations.216MW
SPECTRUM Kakinada,208MW.



ee rendu plants pettaru total 430MW maximum ....aa 430MW 2008 lo oka unit produce chestundi ee electricity alanti units 10s koddi vacchi between 2007-2012 madyalo
i am leading a pious life so far so good
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3975
Registered: 07-2012
Posted From: 125.99.197.136

Rating: 
Votes: 1 (Vote!)

Posted on Sunday, March 17, 2013 - 10:45 pm:       

inko bootu plant l

Nrules:

The APSEB was described as unquestionably the most efficient state owned electricity generating and transmitting/distributing authority in the whole of India (Arun Ghosh 1997, 1782). On many technical aspects, APSEB enjoyed a good reputation amongst the other utilities in India. The PLF of state owned generating stations in AP was 83.2% in 2000, much higher than the national average of 67%




ee artile nenu nammanu gujarat lant load factor geb:92.5%,karnataka kpcl 90% undi same paid artile....


Nrules:


World Bank (1997) Andhra Pradesh : Agenda for Economic Reforms. Report No. 15901-IN

World Bank (1998) Project Appraisal Document on Andhra Pradesh Economic Restructuring Project. Report No: 17710-IN.

World Bank (1999) Project Appraisal Document on Andhra Pradesh Power Sector Restructuring Programme. Report No. 18849 IN





quote:

CBN with his plan to reconstruct entire power sector of AP impressed world bank and world bank approved this plan sanctioned loan under AP Economic Restructuring Project (APERP).

At this time the electrical losses in APSEB is 42% that means a loss of 1500-2000crore per annum , which is main reason for APSEB failure. Later power losses reduced to 22% in 2002 due to reforms followed by CBN.




inda aa articles lo inko animutyam govt lekkallo 30% unte veedu 22% annadu losses inkem anali veedni.....
i am leading a pious life so far so good
 

Bittertruth
Junior Artist
Username: Bittertruth

Post Number: 153
Registered: 11-2012
Posted From: 98.156.73.49

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 10:42 pm:       


Dma:



????Nee yanks. ardham pardham ledaa
 

Dma
Side Hero
Username: Dma

Post Number: 8429
Registered: 11-2009
Posted From: 64.134.224.140

Rating: 
Votes: 1 (Vote!)

Posted on Sunday, March 17, 2013 - 10:34 pm:       


Bittertruth:

Nrules. You rule dude.
Spot on. You nailed it.




 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3974
Registered: 07-2012
Posted From: 192.151.242.181

Rating: 
Votes: 4 (Vote!)

Posted on Sunday, March 17, 2013 - 10:18 pm:       

Yedchinatu undi oo 4 pettina powerplants chupinchamante essays rastara
i am leading a pious life so far so good
 

Bittertruth
Junior Artist
Username: Bittertruth

Post Number: 152
Registered: 11-2012
Posted From: 98.156.73.49

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 09:05 pm:       


Nrules:



Nrules. You rule dude.
Spot on. You nailed it.
 

Nrules
Junior Artist
Username: Nrules

Post Number: 142
Registered: 10-2012
Posted From: 79.170.53.124

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 08:12 pm:       

By Srivatsa Krishna

The favourite avocation of many a politician is to loot the treasury and indulge in giveaways, like there is no tomorrow. The favourite tool for doing so is free power. Keshubhai Patel seduces farmers with free power in perpetuity, which will wipe away the handsome gains made by Gujarat through exemplary power sector reforms via the "Jyotigram" program; Ashok Gehlot has promised a freeze in power tariffs for five years; YSR's first act after assuming power was to give away power free, thereby wiping off the decade-long gains, made through prudent reforms by Chandrababu Naidu.

http://articles.economictimes.indiatimes.com/2012-09-30/news /34177492_1_free-power-power-sector-groundwater-irrigation
 

Nrules
Junior Artist
Username: Nrules

Post Number: 141
Registered: 10-2012
Posted From: 79.170.53.124

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 08:06 pm:       

For More Info...

pmger.org/articles/PowerPolicyEvolutioninAndhraPradesh.doc

REFERENCES UNDERTAKEN BY THIS ANALYSIS:
Andhra Pradesh Electricity Board (1996) Finances of APSEB.

Andhra Pradesh State Electricity Board (1999) Power Development in Andhra Pradesh â 1998-99.

Baijal, Pradip (1999) Restructuring of Power Sector in India: A Base Paper, Economic and Political Weekly Vol.34 No.39.

D,sa, Antonette; K.V.N. Murthy; and A.K.N.Reddy (1999) Indiaâs Power Sector Liberalisation. Economic and Political Weekly, June 5, 1999.

Dixit, Shantanu etal, (1998) WB-Orissa Model of Power Sector Reform: Cure Worse Than Disease, Economic and Political Weekly April 25, 1998

Dubash Navroz E and Sudhir Chella Rajan (2001) Power Politics: Process of Power Sector Reforms in India, Economic and Political Weekly. Vol.36, No.35.

Ghosh, Arun (1997) Break-up and Privatisation of SEB in Andhra Pradesh: An Upcoming Scam. Economic and Political Weekly Vol.32, No.29

Government of Andhra Pradesh (1999) Vision â 2020. State Secretariat, GoAP, Hyderabad.

Government of Andhra Pradesh (2001) Strategy Paper on Power.

Godbole, Madhav (2002) âPower Sector Reforms: If Wishes were Horsesâ, Economic and Political Weekly. Vol.37, No.7.

Haldea, Gajendra (2001) Whither Electricity Reforms, Economic and Political Weekly. Vol.36, No.17.

Harshe, Rajen and C.Srinivasulu (2000) âAndhra Pradesh: Dilemmas of Developmentâ, Economic and Political Weekly. Vol.35, No.23.

Kannan, K.P and N. Vijayaraghavan Pillai (2001) âPlight of Power sector in Indiaâ. Economic and Political Weekly, Vol.36, No.2-3.

Morris, Sebastian (1996) âPolitical Economy of Electrical Power in Indiaâ, Economic and Political Weekly. Vol.31, No.20-21.

Murthy, K. Rama Chandra. 2001. Vidyuth Valayam. Lifeline Communications, Hyderabad. 2001.

Naidu, N. Chandrababu with Sevanti Ninan (2000) Plain Speaking. Viking, New Delhi.

Purkayastha, Prabir (1997) Power Policies: Need for a National Debateâ, Economic and Political Weekly. Vol.32, No.3.

Ranganathan, V (2003) âWorld Bank and Indiaâs Economic Developmentâ, Economic and Political Weekly. Vol.38, No.3. January 18,2003

Rao, S.L (2002) The Political Economy of Power, Economic and Political Weekly. Vol.37, No.33.

Reddy, A.K.N (2001) California Energy Crisis and its Lessons for Power Sector Reform in Indiaâ, Economic and Political Weekly. Vol.36, No.18.

Reddy, Krishna G (2002) New Populism and Liberalisation: Regime Shift under Chandrababu Naidu in AP, Economic and Political weekly. Vol.37, No.9.

Reddy, D. Narasimha (1999) (ed.) Vision 2020: Myths and Realities. Sundarayya Vignana Kendram, Hyderabad

Sankar, T.L. (2002) Towards a Peopleâs Plan for Power Sector Reform, Economic and Political Weekly, Vol.37, No.40.

Sankar, T. L. (2003) Power Sector: Rise, Fall and Reform. Economic and Political Weekly, Vol.38, No.12-13.

Wagle Subodh etal, (1997) SEB Privatisation: Transcending the issue of Ownership, Economic and Political Weekly October 04, 1997

World Bank (1997) Andhra Pradesh : Agenda for Economic Reforms. Report No. 15901-IN

World Bank (1998) Project Appraisal Document on Andhra Pradesh Economic Restructuring Project. Report No: 17710-IN.

World Bank (1999) Project Appraisal Document on Andhra Pradesh Power Sector Restructuring Programme. Report No. 18849 IN
 

Nrules
Junior Artist
Username: Nrules

Post Number: 140
Registered: 10-2012
Posted From: 79.170.53.124

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 08:03 pm:       

V. CONCLUSION

It has been seen that the changes in the AP Power policy can be traced to the policy changes at the national level as part of economic liberalisation, shift in World Bank Policy in power sector lending and leadership of Naidu in AP.

The structural changes in power sector at the national level as well as at the AP state level coincided with similar changes world-wide. It is true that there was a crisis in the Indian power sector and urgent corrective measures were required. This crisis was in the areas of governance, performance and financial. The World Bank and central government gave undue emphasis to the financial crisis and hurried through the need to infuse private capital to solve the supply problem. Sufficient efforts were not taken up to address the problems in the governance and performance areas. This approach of World Bank could be understood, since it needs to answer its majority shareholders (USA, UK, Japan etc) who are keen to expand their markets in countries like India. But the position of the Indian government to go along with this analysis can only be explained through reasons like the opportunities for corruption, lack of political will etc.

In many spheres, Naidu is known for his keenness to project AP as a showpiece. In power sector too, this happened.
 

Nrules
Junior Artist
Username: Nrules

Post Number: 139
Registered: 10-2012
Posted From: 79.170.53.124

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 07:54 pm:       

Though the Congress Party opposed the Bill in the Assembly, overall it is not opposed to the reforms. What ever it did in the Assembly is more of an opposition party gimmick but not its principled stand against reforms. At the national level the reforms were initiated when the Congress Party was in power. Also when it was in power in the state it did not have any hesitation in signing PPAs with private power developers. Sharad Pawar a Congress Chief Minister of Maharastra played a crucial role in preparing the Minimum Action Plan for the power sector and he was instrumental in signing the infamous PPA with Enron for the Dabhol power project. As the power policy of the Central government changed, following it in AP, N. T. Rama Raoâs Telugu Desam government also entered into MOUs with many companies overnight. Some of these MOUs entered the stage of signing PPAs.
 

Nrules
Junior Artist
Username: Nrules

Post Number: 138
Registered: 10-2012
Posted From: 79.170.53.124

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 07:44 pm:       

The power sector reform policy found greater support from the Telugu Desam party which came back to power in 1994. It would be no exaggeration to say that Nara Chandrababu Naiduâs presence made the difference. He was the finance minister in the government led by his father-in-law, N.T.Rama Rao. He completely sided with the private investors intending to invest in the power sector. He carried their brief with out any hesitation. He brought his weight behind the investors though many of them did not have any background in power sector (these investors were called as liquorwalas and panwalas). He lobbied with the central government for extension of deadline for signing MoUs with private developers. Because of this backing these private developers had become influential enough to secure a copy of the letter of extension even before it was signed by the secretary to the Government of India. And on the night of the last day for the deadline the GoAP created a record of sorts by signing a large number of MoUs. Some of these reached the stage of PPA. He made every effort to encourage private participation in the power sector.

In September 1995 Chandrababu Naidu took over the reigns of the state government as the Chief Minister by dethroning his father-in-law. He was for new orientation to be given to the state away from populist packages. He identified himself with market led privatisation policies. He said, âMy goal is to take care of two things. One is development, the other is fiscal discipline. Meanwhile we have to continue to open up the economy, and create conditions that investors welcomeâ (2000, 10). Regarding the need to restructure the power sector Naidu said, âContrary to what my friends in the opposition parties would like to project, the primary purpose of economic reforms is not to make workers insecure or to marginalise the poor. It is to make the future viable. Of no sector is this more true than the power sector. If it is not reformed, darkness looms ahead. Because in every state, the system that provides the power has been stretched to the point of collapseâ (ibid. 186).
 

Nrules
Junior Artist
Username: Nrules

Post Number: 137
Registered: 10-2012
Posted From: 79.170.53.124

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 07:40 pm:       

As a part of the broader economic reforms in October 1991, the central government initiated steps to encourage private investor participation in electricity generation like offering counter guarantee of 16 percent return on equity, tax holiday and attractive debt-equity ratio of 80:20. By the end of that year central Acts were amended to allow private companies to enter into long term power purchase agreements with SEBs to set up and operate power generation plants. There was overwhelming response to this changed policy from both foreign and Indian private investors. Though nearly 200 offers came to set up power plants, MoUs were signed for 95 projects by the end of 1995. From these, eight plants were selected for special treatment and called âfast trackâ projects. Out of these eight plants, three companies chose to set up the plants in Andhra Pradesh. They are: GVK Induatries gas based plant at Jegurupadu, Spectrum Technologies gas based plant at Kakinada, and Hindujaâs coal based thermal plant at Visakhapatnam. These three companies entered in to PPAs with APSEB. GVK Industriesâ Jegurupadu plant is the first one in the country to start power generation. Spectrumâs plant also started power generation. But Hindujaâs plant is yet to take off because of the problems with its PPA.
 

Nrules
Junior Artist
Username: Nrules

Post Number: 136
Registered: 10-2012
Posted From: 79.170.53.124

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 07:36 pm:       

The APSEB was described as unquestionably the most efficient state owned electricity generating and transmitting/distributing authority in the whole of India (Arun Ghosh 1997, 1782). On many technical aspects, APSEB enjoyed a good reputation amongst the other utilities in India. The PLF of state owned generating stations in AP was 83.2% in 2000, much higher than the national average of 67% or the NTPC figure of 80.4%. Vijayawada Thermal Power Station (VTPS), one of the State Owned thermal stations, received the productivity award for the 17th time in 2000 (PLF of 86.9%) and Rayalseema Thermal Power Plant (RTPP) the incentive award for the third time in 2000 (PLF of 94.9%). Other aspects of good performance include fast erection of power stations, and low employee/consumer ratio. APSEB has significantly contributed to the increase of agricultural production in the backward Telengana and Rayalseema regions; it has been a catalyst of industrial growth and improvement of quality of life. It has taken electricity to the nook and corner of the state. 100 percent of the towns and villages, 96.66 percent of the dalit wadas, 89.40 percent of the weaker section colonies and 64.56 percent of the hamlets have access to power. It has energised more than 15 lakh agricultural pumpsets accounting for 43 percent of the irrigated area in the state.
 

Nrules
Junior Artist
Username: Nrules

Post Number: 135
Registered: 10-2012
Posted From: 79.170.53.124

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 07:35 pm:       

ANALYSIS OF POLICY PROCESS IN POWER SECTOR IN ANDHRA PRADESH

N.Sreekumar, M.Thimma Reddy, K.Uma Rao*

I. INTRODUCTION

Among all the sectors in Andhra Pradesh (AP) power sector has already undergone drastic changes in the wake of liberalisation and privatisation policies vigorously pursued by the state government. Recently the credit rating agencies CRISIL and ICRA ranked Andhra Pradesh first in power sector reforms implementation in India1. To enable the implementation of these reforms necessary legislation was enacted at breakneck speed. Following this Government Orders were issued unbundling the erstwhile Andhra Pradesh Electricity Board (APSEB) in to six companies dealing with power generation, transmission and distribution separately. A regulatory commission was also appointed to regulate the sector in accordance with the new Act. If every thing proceeds according to the plan as envisaged by the Government of Andhra Pradesh (GoAP) and its principal backer the World Bank, which has stipulated stringent conditionalities to be able to receive its loan funds, some of these companies will be privatised soon.

The power sector reform is described as the most ambitious change management exercise ever attempted in the government domain in India (Sankar 2002, 4143). Power sector reforms in Andhra Pradesh are being implemented parallel to the structural and fiscal reform programme â AP Economic Restructuring Project (APERP). Both sets of reforms are undertaken with financial support from the World Bank.
 

Boston_baba
Comedian
Username: Boston_baba

Post Number: 1483
Registered: 07-2012
Posted From: 122.167.79.2

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 01:52 pm:       


Dma:

ee sollu vaddu.



akkada sollu cheptundi mudda, ayasapadutundi nuvvu. BM kurrodu chakkaga sources petti cheptunnadu.. mee daggara alage edaina official data unte padeyandi.
Future is not to be predicted.. It is to be created...
 

Semasimham
Junior Artist
Username: Semasimham

Post Number: 518
Registered: 05-2008
Posted From: 171.159.194.11

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 01:31 pm:       


Ballasticmissile:




thanks for the info ..ni vopika ki na lal salam
Rajasa yodha Rajasekhara Johar Johar
http://www.ted.com/talks/ananda_shankar_jayant_fights_cancer_with_a_dance.html
"avineeti, bandhupreeti, matha pichhi, kula pichhi unna party ee rashtramlo yedainna undi ante adi telugu desam party... avuna? kaada?" --Stonford Samba (ikkade yekkado vundi vuntadu)
 

Semasimham
Junior Artist
Username: Semasimham

Post Number: 517
Registered: 05-2008
Posted From: 171.159.194.11

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 01:30 pm:       


Boston_baba:

ikkada evaru evarni mosam cheyatledu..
look at the various gas plants that are commissioned in YSR regime and now they are struggling with lack of gas.
we set ourselves target of 15% p.a. for power sector growth & we achieved that. look at AP budget numbe



point to point emi cheppavu boss


ikkada db janam lite yedi voka rakamga voppukoru
Rajasa yodha Rajasekhara Johar Johar
http://www.ted.com/talks/ananda_shankar_jayant_fights_cancer_with_a_dance.html
"avineeti, bandhupreeti, matha pichhi, kula pichhi unna party ee rashtramlo yedainna undi ante adi telugu desam party... avuna? kaada?" --Stonford Samba (ikkade yekkado vundi vuntadu)
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3971
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 01:24 pm:       


Geohot:



reddochi modalu kinda nunchi links clear ga saduvuku randi mee lanti vallandari kosam anni linka oke chota....


Ballasticmissile:

The Govt of AP approved the proposal of APGENCO to set up a Special Purpose Vehicle(SPV) named as Andhra Pradesh Power Development Company Limited (APPDCL), a Joint Venture Company of APGENCO(with 50% equity) and IL AND FS(50% equity). APPDCL has commenced its functions on 01.03.06. After completion of major activities of development of 2 X 800 MW Coal based Super Critical Thermal Power Station near Krishnapatnam in Nellore Dist, APPDCL is reconstituted with 51% equity of APGENCO and 49% equity of all four APDISCOMS and Govt. of AP.

About APPDCL
Andhra Pradesh Power Development Company Limited (APPDCL) is implementing the following two Mega Power Projects on fast track basis in the state to meet the Supply � Demand gap of energy in the XI and XII plans.

1. 2 x 800MW coal based Supercritical Thermal Power Station near Krishnapatnam in Nellore District, which is about 150 Kms North of Chennai.

2. 2100MW (3 modules of each 700 MW) Combined cycle Power Plant near Karimnagar, which is about 160 Kms north of Hyderabad.

APPDCL commenced its functions on 01.03.06 in site identification, land Acquisition, statutory clearances, project report, environmental studies, availability of inputs, project consultancy services and selection of EPC contractor based on international competitive bidding and substantial progress has been achieved on both projects


deenni pettindi ysr in 2006.....



Ballasticmissile:

http://www.apgenco.gov.in/inner.asp?frm=capacity&sid=126&fil ename=contents.xml&Tagname=GrowthPlans&subhname=GrowthPlans



Ballasticmissile:


kottagvudem stage6:2011

http://en.wikipedia.org/wiki/Kakatiya_Thermal_Power_Station

http://en.wikipedia.org/wiki/Kothagudem_Thermal_Power_Statio n_V_Stage

http://en.wikipedia.org/wiki/Dr_Narla_Tata_Rao_Thermal_Power _Station



Ballasticmissile:

inko 2 yrs lo 5000 mw thermal powerstations untai 5 yrs lo 14-15k mw thermal power installed intakante ye govt chesindo cheppamanu.....

all projects are epc projects ......

ivikakunda wind mills di next yr ki 250mw install avutondi....



i am leading a pious life so far so good
 

Geohot
Junior Artist
Username: Geohot

Post Number: 353
Registered: 03-2010
Posted From: 70.44.197.224

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 01:19 pm:       

Power plant start nunchi - Production varaku easy ga 5 year padutundi.. Mokka 2004 lo veste..fruits 2008 lo vachayi..that 20 GW..

Pramanassweekaram chesina muppavu gantalo 20,000 MW vachesayi ante..YSR ni demudu ani cheppochu..
 

Boston_baba
Comedian
Username: Boston_baba

Post Number: 1480
Registered: 07-2012
Posted From: 122.167.106.253

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 01:19 pm:       


Ballasticmissile:



sorry... bostonbaba.ccdb@gmail.com
Future is not to be predicted.. It is to be created...
 

Boston_baba
Comedian
Username: Boston_baba

Post Number: 1479
Registered: 07-2012
Posted From: 122.167.106.253

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 01:18 pm:       


Ballasticmissile:



send test mail to bostonbaba@gmail.com buddy.
Future is not to be predicted.. It is to be created...
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3970
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 01:14 pm:       


Politicalobserver:





lite inka cbn kante ysr ye yekkuva power lo ani proofs tho saha cheppa....next sunday inko sector....
i am leading a pious life so far so good
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2660
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 01:03 pm:       


Ballasticmissile:




Annai Coal gate scam ttarvata andariki Coal beds allocate avvinavi cancel ayyi Muddi endipoyi vundhi.Coal important chesukundam ante double duty ki viable kavataledhu daani badhulu Indonesia loney power plant pettukovatam better antunnaru.

Nenu kaatho kootho vyaparam chesta naaku idea vundhi state lo praistithi andaru vaadilaa oobilo muligi poyaaru
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3969
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:58 pm:       


Politicalobserver:

Production lenivi enduku bujjaa


inko 2 yrs lo 5000 mw thermal powerstations untai 5 yrs lo 14-15k mw thermal power installed intakante ye govt chesindo cheppamanu.....

all projects are epc projects ......

ivikakunda wind mills di next yr ki 250mw install avutondi....
i am leading a pious life so far so good
 

Boston_baba
Comedian
Username: Boston_baba

Post Number: 1473
Registered: 07-2012
Posted From: 122.178.250.79

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:58 pm:       


Ballasticmissile:

ysr 2007-2012 occhina power plants chuiste avi kuda cbn fruits ante inkem aanali.



pacha kamerlu anukovali.
Future is not to be predicted.. It is to be created...
 

Boston_baba
Comedian
Username: Boston_baba

Post Number: 1472
Registered: 07-2012
Posted From: 122.178.250.79

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:57 pm:       


Politicalobserver:

They defaulted their payments last year to the bank.Eto chebutunnav prastutha state lo andaru appulu lone vunnaru



not sure whether this is true or not.. if true, not sure whether its bcos of powerplant businesses.
truth is, they are quititng roads construction and going more into power plants.
Future is not to be predicted.. It is to be created...
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2658
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:52 pm:       


Ballasticmissile:




Production lenivi enduku bujjaa
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2657
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:51 pm:       


Boston_baba:




They defaulted their payments last year to the bank.Eto chebutunnav prastutha state lo andaru appulu lone vunnaru.They bought Coal mines in Australia which hurt them cruelly.Road construction right now is not profitable in India
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3968
Registered: 07-2012
Posted From: 125.99.197.136

Rating: 
Votes: 1 (Vote!)

Posted on Sunday, March 17, 2013 - 12:51 pm:       


Boston_baba:

nd divert all their resources towards power plants.



cbn fruits annaru chuste 1998 nunchi 2006 varaku thermal powerplants cheppukunedi simhadri inka chinna chitaka konni.....

ysr 2007-2012 occhina power plants chuiste avi kuda cbn fruits ante inkem aanali....:D
i am leading a pious life so far so good
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3967
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:48 pm:       


Politicalobserver:



oppukuntara ippatikanna cbn kante ysr ye yekkuva power capacity instalment cheyinchadani.....:D
i am leading a pious life so far so good
 

Boston_baba
Comedian
Username: Boston_baba

Post Number: 1468
Registered: 07-2012
Posted From: 122.178.250.79

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:47 pm:       


Politicalobserver:

LANCO is also facing heat



telistene matladu bro..
recently LANCO decided to quit road construction business and divert all their resources towards power plants.
Future is not to be predicted.. It is to be created...
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2655
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:42 pm:       


Boston_baba:




Annai more or less this is the truth.LANCO is also facing heat
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2654
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:41 pm:       


Ballasticmissile:




SEZ pakkana ettu Power plant pettali ante Coal and Daani transportation evari deggara vuntayi.Plant senkustapana cheyataniki state gov permissions chalu.Seriously opening and running it are another thing
 

Boston_baba
Comedian
Username: Boston_baba

Post Number: 1467
Registered: 07-2012
Posted From: 122.167.224.64

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:37 pm:       


Muddamandaram:

Nenu activegaa tirigina 3 companies paapam 1000 MW+ plants sanka naakipoyayi.



sontha kavitvam aapi, edaina official stats unte patra... otherwise, stop throwing mud on others.
Future is not to be predicted.. It is to be created...
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3966
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:37 pm:       


Politicalobserver:

Annai okathi aduguta cheppu nuvvu seriously oka industry ki 10 permits kavalasi vasthey andulo enni state list loki vasthayi cheppu?



environmental clearence,noc from local authority ye main avi lekunda yevanna start avutaya....

neku sez lo facilities gurinchi idea undi ga .....bayata pettataniki sez loki differance cheppu....

sez lo pettalante less permissions needed.....kadantava
i am leading a pious life so far so good
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2652
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:37 pm:       


Boston_baba:



There is more annai Both CBN and YSR were strategically stupid including their respective communities aa time lo Energy resources meeda grip penchukovali ani teliyaledu.

Right now Africa ,Australia and Indonesia loo Energy resources kosam deeketam.Last year time ki nenu Africa lo Malawi and Indonesia,East Timor vellay emaina dorukutudi emo ani
 

Boston_baba
Comedian
Username: Boston_baba

Post Number: 1466
Registered: 07-2012
Posted From: 122.167.224.64

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:36 pm:       


Ballasticmissile:

mudda i can strongly say number of megawats ki permission yekkuva YSR time lone ani....andhrajyoti lo article kuda vacchindi reg powerplants in uttarandra....

inka cheppali ante power plants pettataniki ysr icchinanni NOC(no objection certificates) yevvaru ye state lo ivvaledu)




MM gariki pitta kathala tho pakka valla meeda peda veyadam alavatu.. light teesko bro...
Future is not to be predicted.. It is to be created...
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3965
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:35 pm:       


Politicalobserver:



Muddamandaram:



https://www.clpgroup.com/ouroperations/assetsandservices/pow ergeneraton/renewablepowerplants/Pages/narmadawindfarm.aspx

inda wind plants ki kuda ysr ye permission icchadu.....
i am leading a pious life so far so good
 

Boston_baba
Comedian
Username: Boston_baba

Post Number: 1465
Registered: 07-2012
Posted From: 122.167.224.64

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:33 pm:       


Politicalobserver:

Annai adhi nijam ayyitey AP lo 4000 MW deficit vundedhi kadu.Today in AP the industrial power holiday is 4 days per week



we have plants which are not running bcos of lack of gas. adi matter.
Future is not to be predicted.. It is to be created...
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2651
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:33 pm:       


Ballasticmissile:




Annai okathi aduguta cheppu nuvvu seriously oka industry ki 10 permits kavalasi vasthey andulo enni state list loki vasthayi cheppu?
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3964
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:32 pm:       


Politicalobserver:



mari powerplante ye kattaledu mottam cbn time lone annaru.....

chuste cbn time lokanna triple powerplanta kadantava
i am leading a pious life so far so good
 

Boston_baba
Comedian
Username: Boston_baba

Post Number: 1464
Registered: 07-2012
Posted From: 122.167.224.64

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:31 pm:       


Muddamandaram:

2006 to 2007 madhyalo 24 power plants in Nellore.

Ippatiki Genco okkati ayyindi.

330 MW plant okkati commissioning ayyindi.

Migilnavi godalu kooda kattalekapoyyaaru.
Permissions annee adoka tyfeloo unnaayi.

case 1 bidding ippatiki avvaledu


case 1 scam gurinchi entha thakkuva maattaditee antha better.




any official source pls....
Future is not to be predicted.. It is to be created...
 

Simpletruth
Side Hero
Username: Simpletruth

Post Number: 7301
Registered: 02-2010
Posted From: 71.178.54.240

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:30 pm:       


Boston_baba:




TT ki eenadu chebithe gaani nijamu kadhu. Good job YSR
Round 1: Mahesh(Khaleja vs Orange)
Round 2: Mahesh(Dookudu vs Racha)
Round 3: Charan(BM vs Nayak)
Round 4: pending(SVSC vs Evadu)
Round 5: pending (sukku film vs Zanzeer-telugu)
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2649
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:29 pm:       


Boston_baba:




Annai adhi nijam ayyitey AP lo 4000 MW deficit vundedhi kadu.Today in AP the industrial power holiday is 4 days per week
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3963
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:28 pm:       


Muddamandaram:



kottagvudem stage6:2011

http://en.wikipedia.org/wiki/Kakatiya_Thermal_Power_Station

http://en.wikipedia.org/wiki/Kothagudem_Thermal_Power_Statio n_V_Stage

http://en.wikipedia.org/wiki/Dr_Narla_Tata_Rao_Thermal_Power _Station


veetillo yevi cbn gori time lo expand avvaledu after 2008 ye ayyai deeniki kuda cbn goride credit aa....
i am leading a pious life so far so good
 

Boston_baba
Comedian
Username: Boston_baba

Post Number: 1463
Registered: 07-2012
Posted From: 122.167.224.64

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:28 pm:       


Muddamandaram:

BM nuvvu nijangaa govt job chesthuntee dont u know the minimum time required for the commissioning of a power plant as 5 financial years.

Evarni mosam cheddamanukuntunnaaavu.



bhayya.. ikkada evaru evarni mosam cheyatledu..
look at the various gas plants that are commissioned in YSR regime and now they are struggling with lack of gas.
we set ourselves target of 15% p.a. for power sector growth & we achieved that. look at AP budget numbers and planning commission numbers.
Future is not to be predicted.. It is to be created...
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2648
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:26 pm:       

The only hope for AP are NTPC and Atomic power
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2647
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:23 pm:       


Ballasticmissile:




annai GAs plant evi kooda operationalise avvav Annai.LANCO vodu repo maapo IP pedathadu
 

Boston_baba
Comedian
Username: Boston_baba

Post Number: 1462
Registered: 07-2012
Posted From: 122.167.224.64

Rating: 
Votes: 1 (Vote!)

Posted on Sunday, March 17, 2013 - 12:22 pm:       


Ballasticmissile:



bujja...Nice posts all through. appreciate your efforts in bringing out facts.
any stats (by official agencies) will prove that YSR better than CBN. (cross state and cross temporal study.)
Future is not to be predicted.. It is to be created...
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3962
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:22 pm:       


Politicalobserver:



Muddamandaram:




http://www.apgenco.gov.in/inner.asp?frm=capacity&sid=126&fil ename=contents.xml&Tagname=GrowthPlans&subhname=GrowthPlans


veetiki kuda cbn gore permission icchara ilanti plants oo 4 maa mohana kottandi
i am leading a pious life so far so good
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2646
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:21 pm:       

http://www.lancogroup.com/DynTestform.aspx?pageid=10
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3961
Registered: 07-2012
Posted From: 125.99.197.136

Rating: 
Votes: 1 (Vote!)

Posted on Sunday, March 17, 2013 - 12:18 pm:       


Lolligadu:

Lanco Kondapalli



Muddamandaram:




The Govt of AP approved the proposal of APGENCO to set up a Special Purpose Vehicle(SPV) named as Andhra Pradesh Power Development Company Limited (APPDCL), a Joint Venture Company of APGENCO(with 50% equity) and IL AND FS(50% equity). APPDCL has commenced its functions on 01.03.06. After completion of major activities of development of 2 X 800 MW Coal based Super Critical Thermal Power Station near Krishnapatnam in Nellore Dist, APPDCL is reconstituted with 51% equity of APGENCO and 49% equity of all four APDISCOMS and Govt. of AP.

About APPDCL
Andhra Pradesh Power Development Company Limited (APPDCL) is implementing the following two Mega Power Projects on fast track basis in the state to meet the Supply â Demand gap of energy in the XI and XII plans.

1. 2 x 800MW coal based Supercritical Thermal Power Station near Krishnapatnam in Nellore District, which is about 150 Kms North of Chennai.

2. 2100MW (3 modules of each 700 MW) Combined cycle Power Plant near Karimnagar, which is about 160 Kms north of Hyderabad.

APPDCL commenced its functions on 01.03.06 in site identification, land Acquisition, statutory clearances, project report, environmental studies, availability of inputs, project consultancy services and selection of EPC contractor based on international competitive bidding and substantial progress has been achieved on both projects


deenni pettindi ysr in 2006.....
i am leading a pious life so far so good
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2644
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:17 pm:       


Ballasticmissile:




Tammudu veelu expansion ki vellaru .Expansion and Establishing a new one are two different things.

even then veelu evariki GAs MoU allocat avvaledhu
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2643
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:15 pm:       


Ballasticmissile:




Annai ala kadu Enni Coal blocks AP lo power plants ki allocate ayyini?Entha mandhi GAIL and Reliance tho MoU understanding vacchindhi?.Enni Companies ki Railways tho MoU kudirindhi ?How many secured their finances ?

Ayyi cheppu?

Nenu power plant ani vooginodiney
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3960
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:14 pm:       


Politicalobserver:



Muddamandaram:



Jegurupadu Combined Cycle Power Plant - I GVK Jegurupadu E Godavari Andhra Pradesh Private Southern 2 x 46, 1 x 49, 1 x 75 216.00 16°55â²54â³N 81°51â²36â³E
APGPCL Plant - I APGPCL Vijjeswaram W Godavari Andhra Pradesh Joint Southern 2 x 33, 1 x 34 100.00 16°56â²02â³N 81°43â²27â³E
Kusalava power plant,GMK Formly Triveni Gollapallem E Godavari Andhra Pradesh Private Southern 2Ã1.1,1Ã1 3.2
Spectrum Combined Cycle Power Plant Spectrum E Godavari Andhra Pradesh Private Southern 2 x 46, 1 x 47, 1 x 70 209.00 17°03â²31â³N 82°18â²34â³E
Gautami Combined Cycle Power Plant Mytas Peddapuram E Godavari Andhra Pradesh Private Southern 2 x 145, 1 x 174 464.00 17°02â²21â³N 82°08â²43â³E
Konaseema Combined Cycle Power Plant KGPL Ravulapalem E Godavari Andhra Pradesh Private Southern 2 x 140, 1 x 165 445.00 16°44â²05â³N 81°51â²44â³E
Lanco Kondapalli Power Plant- I Lanco Kondapalli Krishna Andhra Pradesh Private Southern 2 x 119.57, 1 x 128.99 368.13 16°38â²20â³N 80°33â²00â³E
Lanco Kondapalli Power Plant- II Lanco Kondapalli Krishna Andhra Pradesh Private Southern 1 x 233, 1 x 133 366.00 16°38â²20â³N 80°33â²00â³E
Vemagiri Combined Cycle Power Plant GMR Vemagiri E Godavari Andhra Pradesh Private Southern 1 x 137, 1 x 233 370.00 16°55â²29â³N 81°48â²46â³E
Samarlakota Combined Cycle Power Plant Reliance Samarlakota E Godavari Andhra Pradesh Private Southern 1 x 140, 1 x 80 220.00
i am leading a pious life so far so good
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3959
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:08 pm:       

,

Lolligadu:



sare ayite environmental clearence certificate ekkuva industries ki 2006-2011 yenduku vacchayo kuda dlms ivvandi....
i am leading a pious life so far so good
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2640
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:07 pm:       


Ballasticmissile:




Adhi only land allocation varaku and even allocate ayina nuvvu plant ettataavu ani emi rule ledu.
 

Dma
Side Hero
Username: Dma

Post Number: 8415
Registered: 11-2009
Posted From: 70.176.173.118

Rating: 
Votes: 1 (Vote!)

Posted on Sunday, March 17, 2013 - 12:06 pm:       


Ballasticmissile:

Ballasticmissile




oka soda taagi, YSR power sector ki em sesaado seppu tambee... ee sollu vaddu. kaneesam basics lekunda adda diddam gaa vaadichavaddu.
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3958
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:06 pm:       


Politicalobserver:


Annai Power anedhi Central list subject anukunta state goverment can only provide Land for it anukunna.Railway wagon wakes,Coal ani central lobbying kada.

Power Finance Corporation kooda oka part play chestadhi


state lo poweplants ki private vatiki compulsary state govt permission undali...
i am leading a pious life so far so good
 

Lolligadu
Comedian
Username: Lolligadu

Post Number: 1600
Registered: 09-2012
Posted From: 50.117.61.48

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:05 pm:       


Ballasticmissile:

ysr time lo easy ga permissions vacchevi anduke yekuva industries pettaru


 

Lolligadu
Comedian
Username: Lolligadu

Post Number: 1599
Registered: 09-2012
Posted From: 50.117.61.48

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:04 pm:       


Muddamandaram:

Just blow ur horn where u r strong. Agreeed. Kaani dont come to waters u r not sure of


bless me abhinava sheakisphere
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3957
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:04 pm:       

main cheap land and easy permissions kavali industries ki.....

ysr time lo easy ga permissions vacchevi anduke yekuva industries pettaru....

ramky fama city in vizag ki kuda yedo okati cheppandi....

nellore lo kuda some leather plant yedo pettinchadu.....1000s of crores tho....

easy permissions with backdoor money anduke industries yegabaddai...
i am leading a pious life so far so good
 

Muddamandaram
Hero
Username: Muddamandaram

Post Number: 14984
Registered: 05-2011
Posted From: 37.228.105.225

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:04 pm:       

BM deni payment daanidee.

Permission ichinavi enni fruitful ayyayii.


Nenu activegaa tirigina 3 companies paapam 1000 MW+ plants sanka naakipoyayi.
Pulpannai to Dbers: dont be immaturish.
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2637
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:03 pm:       


Ballasticmissile:




Annai Power anedhi Central list subject anukunta state goverment can only provide Land for it anukunna.Railway wagon wakes,Coal ani central lobbying kada.

Power Finance Corporation kooda oka part play chestadhi
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3956
Registered: 07-2012
Posted From: 125.99.197.136

Rating: 
Votes: 2 (Vote!)

Posted on Sunday, March 17, 2013 - 12:01 pm:       


Muddamandaram:



mudda i can strongly say number of megawats ki permission yekkuva YSR time lone ani....andhrajyoti lo article kuda vacchindi reg powerplants in uttarandra....

inka cheppali ante power plants pettataniki ysr icchinanni NOC(no objection certificates) yevvaru ye state lo ivvaledu)

hindujas 1980s lo permission teesukuni ippudu pedutunnaru vizag lo....yendukantav...

alane inka chala chala.....
i am leading a pious life so far so good
 

Muddamandaram
Hero
Username: Muddamandaram

Post Number: 14983
Registered: 05-2011
Posted From: 37.228.105.225

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 12:01 pm:       

BM itu eyyi puvvulu. vini pedathaaaa
Pulpannai to Dbers: dont be immaturish.
 

Muddamandaram
Hero
Username: Muddamandaram

Post Number: 14982
Registered: 05-2011
Posted From: 37.228.105.225

Rating: 
Votes: 2 (Vote!)

Posted on Sunday, March 17, 2013 - 11:59 am:       

2006 to 2007 madhyalo 24 power plants in Nellore.

Ippatiki Genco okkati ayyindi.

330 MW plant okkati commissioning ayyindi.

Migilnavi godalu kooda kattalekapoyyaaru.
Permissions annee adoka tyfeloo unnaayi.

case 1 bidding ippatiki avvaledu


case 1 scam gurinchi entha thakkuva maattaditee antha better.
Pulpannai to Dbers: dont be immaturish.
 

Muddamandaram
Hero
Username: Muddamandaram

Post Number: 14980
Registered: 05-2011
Posted From: 37.228.105.225

Rating: 
Votes: 2 (Vote!)

Posted on Sunday, March 17, 2013 - 11:55 am:       

BM nuvvu nijangaa govt job chesthuntee dont u know the minimum time required for the commissioning of a power plant as 5 financial years.

Evarni mosam cheddamanukuntunnaaavu.

Just blow ur horn where u r strong. Agreeed. Kaani dont come to waters u r not sure of. Moreover ilaanti sotla evaru etu nunsi data tho vattaaaroo thelidu.
Pulpannai to Dbers: dont be immaturish.
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3955
Registered: 07-2012
Posted From: 125.99.197.136

Rating: 
Votes: 1 (Vote!)

Posted on Sunday, March 17, 2013 - 11:52 am:       


Dma:

ye govt ki ayina, ye policies ayina results teliyali ante 3-5 years paduthundi after they started.

What YSR enjoyed was the benefits of CBN work.

What Rosiyya and KiKuRe is paying is for YSR's foolishness.

If it were not for Rosiyya, who paid off a lot of debts in his term, the state would have been even worst situation





ante 1000mw install cheste 4-5 yrs patu turbines tipparantav antena.....ok ...

minimum 50-60% of installe capacity ventane vastundi next year kalla report lo untundi 3 yrs lo mottam capacity....maximum cases lo ...

kani ikkada chalaaaaaaa years pattindi antav
i am leading a pious life so far so good
 

Dma
Side Hero
Username: Dma

Post Number: 8413
Registered: 11-2009
Posted From: 70.176.173.118

Rating: 
Votes: 1 (Vote!)

Posted on Sunday, March 17, 2013 - 11:47 am:       


Ballasticmissile:

Ballasticmissile




ye govt ki ayina, ye policies ayina results teliyali ante 3-5 years paduthundi after they started.

What YSR enjoyed was the benefits of CBN work.

What Rosiyya and KiKuRe is paying is for YSR's foolishness.

If it were not for Rosiyya, who paid off a lot of debts in his term, the state would have been even worst situation
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3954
Registered: 07-2012
Posted From: 125.99.197.136

Rating: 
Votes: 2 (Vote!)

Posted on Sunday, March 17, 2013 - 11:47 am:       


Dma:

Bob vunnantha kaalam power sector meeda spend sesi, infra build sesad. The work was completed just before he lost.

Aa tarvaatha vachina YSR govt just reaped the benefits.

47 nunchi 67 ki tevadaaniki YS em sesaado konchem seppu.





aa chesededo 9 yrs lo yenduku podavaledu ani thermal power plants 1-2 yrs lo construction ayipotai proved example maximum 3 yrs....kani babu gariki 9 yrs saripoledu antav.....antena....
i am leading a pious life so far so good
 

Lolligadu
Comedian
Username: Lolligadu

Post Number: 1598
Registered: 09-2012
Posted From: 50.117.61.48

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 11:45 am:       

power sector ni nakinchina 5* gudduthunna manasika balavanthulu kaun ?
 

Muddamandaram
Hero
Username: Muddamandaram

Post Number: 14979
Registered: 05-2011
Posted From: 37.228.105.225

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 11:45 am:       

BM manassakshi anedi okatuntee u cant say that.

Be honest in ur numbers. Aa numbers game ella jaruguddo neeku thelidaa naaku thelidaa.
Edoo paapam ikkada janaalaki thelidani eseyyadamenaaa.

What percentage of the budget was spent on what.
Coz of the PRCthe major allocations u r talking in YSR regime has gone to salaries and maintanance rather than new developmental activities.
Pulpannai to Dbers: dont be immaturish.
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3953
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 11:45 am:       


Muddamandaram:



ante planning commision report tappu antava regarding debt....2009 varaku india lo one of lowest current prices manavi....asalu penchaledu prices....
i am leading a pious life so far so good
 

Dma
Side Hero
Username: Dma

Post Number: 8412
Registered: 11-2009
Posted From: 70.176.173.118

Rating: 
Votes: 1 (Vote!)

Posted on Sunday, March 17, 2013 - 11:45 am:       


Ballasticmissile:

electricity lo kuda babu garu podochindi yemi ledu 1999 lo 41,000 unnadanni kastapadi 47k ki teccharu losses 32 nunchi 27.7%....

babu garu 5th nunci 4th position ki teccharu power lo....


YSR 47 nunchi 67k ki pencharu power availability losses to 19% and ippudu 15% losses....






Bob vunnantha kaalam power sector meeda spend sesi, infra build sesad. The work was completed just before he lost.

Aa tarvaatha vachina YSR govt just reaped the benefits.

47 nunchi 67 ki tevadaaniki YS em sesaado konchem seppu.
 

Pulpfiction
Megastar
Username: Pulpfiction

Post Number: 21848
Registered: 02-2009
Posted From: 122.169.225.235

Rating: 
Votes: 1 (Vote!)

Posted on Sunday, March 17, 2013 - 11:41 am:       

ysr


Six point gain anta #bemmi-facepalm
 

Muddamandaram
Hero
Username: Muddamandaram

Post Number: 14978
Registered: 05-2011
Posted From: 37.228.105.225

Rating: 
Votes: 2 (Vote!)

Posted on Sunday, March 17, 2013 - 11:40 am:       

edisinatttu undi.

What ahappened to all the power plants that were granted the permissions during YDSR reign.

Ippataki financial closure leka allaaadipothunnaaayi.

Another 5 yrski koodaa complete ayyetttu levvu.
Current debt of Ap transco is 11000 crores.
Ee issue anytime pelee time bomb laagaa undi.

Zero debt nunchi ee losseski succesfulgaa 2008 purchase teesukochindi.

Above that govt has to release the funds to the banks.
Interest has to be paid by transco.
Titanic ship muniginattu munagabothondiii AP power.

Most of the success of Apelectricity board has been the vision of Narla Tat Rao.
CBN was a very good manager.
Beautiful systema and procedures has been established by Tata Rao.

Just manam naakinchaaam antheeee.
Pulpannai to Dbers: dont be immaturish.
 

Lolligadu
Comedian
Username: Lolligadu

Post Number: 1597
Registered: 09-2012
Posted From: 50.117.61.48

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 11:39 am:       


Ballasticmissile:

appudu kaki lekka annaru idi planning commision report....


as power reforms lekuntey AP M ayyi undedi ani teleda mesharooo. CBN's power reforms are implemented in many states so kottu katteyyi
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3952
Registered: 07-2012
Posted From: 125.99.197.136

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 11:30 am:       

gas plants,ippudunna thermal powerplants...whinch are in construction ki kuda cbn ye icchadu permissions....lol...
\


i am leading a pious life so far so good
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3950
Registered: 07-2012
Posted From: 125.99.197.136

Rating: 
Votes: 3 (Vote!)

Posted on Sunday, March 17, 2013 - 11:29 am:       


Gotcha:

edichinatu undi. ysr enjoyed the fruits of cbn electricity reforms.




allocations maniki yekkuva cbn time lokanna,expendeture yekkuva cbn time lo kanna....kani chesindi cbn fruits lol....

gdp groath in cbn tenure koncham sepatlo pedata -ve groath undi 1996 nunchi 2-3 yrs lo...

1996 varku no -ve growth...2004 nunchi all positive 9 yrs lo yenduku -ve groath oo kuda seppandi....

Lolligadu:

iffatiki oka 4 theds esuntav comparison annitlo debbadindi enduk mesharoo time bokka



appudu kaki lekka annaru idi planning commision report....
i am leading a pious life so far so good
 

Methhanithodugu
Megastar
Username: Methhanithodugu

Post Number: 23378
Registered: 12-2008
Posted From: 115.184.241.3

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 11:27 am:       


Ballasticmissile:




http://www.youtube.com/watch?v=N9nAJQoTSp4

sanna ga untaru kaani.... Middle class danemma Shock bagundi by Con-Gress!!!
Jai Chandra Madiga garu
 

Lolligadu
Comedian
Username: Lolligadu

Post Number: 1595
Registered: 09-2012
Posted From: 50.117.61.48

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 11:24 am:       

iffatiki oka 4 theds esuntav comparison annitlo debbadindi enduk mesharoo time bokka
 

Politicalobserver
Side Hero
Username: Politicalobserver

Post Number: 2634
Registered: 11-2012
Posted From: 117.203.61.248

Rating: N/A
Votes: 0 (Vote!)

Posted on Sunday, March 17, 2013 - 11:22 am:       


Ballasticmissile:




Prastutham voolo raithulu emanukuntunnaru bujjaa?
 

Gotcha
Hero
Username: Gotcha

Post Number: 10324
Registered: 02-2008
Posted From: 98.206.204.161

Rating: 
Votes: 5 (Vote!)

Posted on Sunday, March 17, 2013 - 11:22 am:       

edichinatu undi. ysr enjoyed the fruits of cbn electricity reforms.
This real estate is for sale.
 

Ballasticmissile
Side Hero
Username: Ballasticmissile

Post Number: 3949
Registered: 07-2012
Posted From: 125.99.197.136

Rating: 
Votes: 7 (Vote!)

Posted on Sunday, March 17, 2013 - 11:20 am:       

http://oi46.tinypic.com/mltjz6.jpg

http://oi46.tinypic.com/mltjz6.jpg

electricity lo kuda babu garu podochindi yemi ledu 1999 lo 41,000 unnadanni kastapadi 47k ki teccharu losses 32 nunchi 27.7%....

babu garu 5th nunci 4th position ki teccharu power lo....


YSR 47 nunchi 67k ki pencharu power availability losses to 19% and ippudu 15% losses....

power lo we are 2nd ahead of all only lagging behind maharastra....efficiency lo top5.....manam tappa migilinavi buddi rastralu like assam,megalaya etc....most efficient transmission is A.P
i am leading a pious life so far so good

Add Your Message Here
Post:
Bold text Italics Underline Create a hyperlink Insert a clipart image HASH(0xc83ef8){Movie Clipart}
Show / hide regular icons selection options

Click on following links to open cliparts by Alphabetical Order

 A   B   C   D   E   F   G   H   I   J   K   L   M  

N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Show / Hide Filmy icons selection options

Click on following links to open cliparts by Alphabetical Order

  A   B   C   D   E   F   G   H   I   J   K   L   M  

N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Username: Posting Information:
This is a public posting area. Enter your username and password if you have an account. Otherwise, enter your full name as your username and leave the password blank. Your e-mail address is optional.
Password:
E-mail:
Options: Enable HTML code in message
Automatically activate URLs in message
Action: